AMMONIA PIPE MARKER GUIDE
12345
1Abbreviations
- BD
- Booster Discharge
- HTRS
- High Temp Recirculated Suction
- CD
- Condenser Drain
- LIC
- Liquid Injection Cooling
- DC
- Defrost Condensate
- LSS
- Low Stage Suction
- ES
- Economizer Suction
- LTRL
- Low Temp Recirculated Liquid
- HGD
- Hot Gas Defrost
- LTRS
- Low Temp Recirculated Suction
- HPL
- High Pressure Liquid
- RV
- Relief Vent
- HSD
- High Stage Discharge
- TSR
- Thermosyphon Return
- HSS
- High Stage Suction
- TSS
- Thermosyphon Supply
- HTRL
- High Temp Recirculated Liquid
2Physical State
LIQ
- LIQUID STATE
- YELLOW BAND
VAP
- VAPOR STATE
- BLUE BAND
3Refrigerant Name
AMMONIA
- ORANGE BODY
4Pressure Level
HIGH
- >70 PSIG
- RED BAND
LOW
- < 70 PSIG
- GREEN BAND
5Directional Arrow
- DIRECTION OF FLOW
Pipe Marking Size Guide
| Diameter | Marker Width | Marker Length | Letter Size | Physical State | Pressure Level |
|---|---|---|---|---|---|
| Up to 1-1/4" | 1” | 8” | 1/2” | 1/2” | 1/2” |
| Greater than 1-1/4” – 2” | 1-1/2” | 8” | 3/4” | 3/4” | 3/4” |
| Greater than 2” – 7” | 2-1/2” | 12” | 1-1/4” | 1” | 1” |
| Greater than 7” – 10” | 3-1/2” | 24” | 2-1/2” | 1-1/2” | 1-1/2” |
| Over 10” | 4-1/2” | 32” | 3-1/2” | 2” | 2” |
| Pipe Markers shall be located | Clarifying Statements |
|---|---|
| Once on the piping in every area through which the refrigeration piping passes | |
| Before and after piping penetrations of walls, ceilings and floors, | |
| On extended horizontal or vertical runs of pipe | Must be labeled every 40 Feet |
| Piping Termination at equipment | When piping terminates at equipment and is within 24” of a marker it is not necessary to place an additional marker at the termination point |
| Before and after a change in piping direction | When piping changes direction more than once and is within 24” of a marker, it is not necessary to place an additional marker between the directional changing elbows |