AMMONIA PIPE MARKER GUIDE

LTRS ammonia pipe marker: LTRS, LIQ and VAP bands, AMMONIA, LOW band and flow arrow 12345

1Abbreviations

BD
Booster Discharge
HTRS
High Temp Recirculated Suction
CD
Condenser Drain
LIC
Liquid Injection Cooling
DC
Defrost Condensate
LSS
Low Stage Suction
ES
Economizer Suction
LTRL
Low Temp Recirculated Liquid
HGD
Hot Gas Defrost
LTRS
Low Temp Recirculated Suction
HPL
High Pressure Liquid
RV
Relief Vent
HSD
High Stage Discharge
TSR
Thermosyphon Return
HSS
High Stage Suction
TSS
Thermosyphon Supply
HTRL
High Temp Recirculated Liquid

2Physical State

LIQ
  • LIQUID STATE
  • YELLOW BAND
VAP
  • VAPOR STATE
  • BLUE BAND

3Refrigerant Name

AMMONIA
  • ORANGE BODY

4Pressure Level

HIGH
  • >70 PSIG
  • RED BAND
LOW
  • < 70 PSIG
  • GREEN BAND

5Directional Arrow

  • DIRECTION OF FLOW
The original IMSS ammonia pipe marker guide. Select to zoom.

Pipe Marking Size Guide

DiameterMarker WidthMarker LengthLetter SizePhysical StatePressure Level
Up to 1-1/4"1”8”1/2”1/2”1/2”
Greater than 1-1/4” – 2”1-1/2”8”3/4”3/4”3/4”
Greater than 2” – 7”2-1/2”12”1-1/4”1”1”
Greater than 7” – 10”3-1/2”24”2-1/2”1-1/2”1-1/2”
Over 10”4-1/2”32”3-1/2”2”2”
Pipe Markers shall be locatedClarifying Statements
Once on the piping in every area through which the refrigeration piping passes
Before and after piping penetrations of walls, ceilings and floors,
On extended horizontal or vertical runs of pipeMust be labeled every 40 Feet
Piping Termination at equipmentWhen piping terminates at equipment and is within 24” of a marker it is not necessary to place an additional marker at the termination point
Before and after a change in piping directionWhen piping changes direction more than once and is within 24” of a marker, it is not necessary to place an additional marker between the directional changing elbows